High Voltage Grid Interconnection60 kV
Pombal High-Voltage Line
Client / DeveloperESI Solar 1, Unipessoal Lda
LocationPombal, Portugal
Timeline2023 - 2024
Project Overview
Construction and testing of the 60 kV electrical interconnection line between the Pombal Solar PV Substation and the E-REDES distribution substation, comprising 1,321 m of overhead line (7 steel towers) and 2,682 m of underground cable.
Technical Specifications
Voltage Level60 kV
Overhead Section1.321 metros (7 apoios metálicos)
Underground Section2.682 metros
Grid InterconnectionSubestação E-REDES Pombal